Solar tree

опубліковано: 17 грудня 2021 оновлено: 22 жовтня 2024

proposal (project), the implementation of which will be funded by investors in the city of Kamyanske

 

1. * Project name:

"Sunny tree"

2. * Area where the project is planned

Factory district

3. * Exact address and name of the object for which the project is planned:

Svobody Avenue, 42-A, Kamyanske
Square near the T.G. Shevchenko

 

4. * Description and justification of the need to implement the project :

 

№ s / n

Question

Reply

1.

The main purpose of the project, to eliminate which problem is aimed at project implementation

 

The functional purpose of the Solar Tree project is to conduct environmental environmental monitoring. Made of environmentally friendly materials and equipped with solar panels with special sensors. The tree has both functional and aesthetic significance, and the design of the tree will be the decoration of the city and will attract the attention of city guests.

2.

Brief description of the proposed project and stages (measures) of project implementation

 

The height of the tree is 5.5 meters. LED screens with anti-vandal protection are installed on the branches. News, advertisements and social videos can be broadcast on the screens around the clock. A lamp is installed under each screen. It is planned to install benches and devices for charging mobile devices, as well as a determinant of air pollution.

3.

The main groups of residents who will be able to use the results of the project; the number of people who will have access to the facility

The project is aimed at all target audiences.

4.

Expected project results

After the installation of the tree, the aesthetic appearance of the square is expected to improve, the city will be one of many who care about the environment (the ability to determine the background concentration of pollutants, which will greatly help environmentalists) and create   energy efficient art object.

5. * Estimated cost of the project

(all components of the project (materials and services) required for its implementation, and their estimated cost)

№ s / n

List of expenses

Estimated cost, UAH

1.

Project development

10,000

2.

Set of solar panels

120 473

3.

 Epsolar charging controller

5 112

4.

Altek rechargeable battery

16 888

5.

Metal pipes

7,000

6.

Screen

5,000

7.

Purchase of wood

4,500

8.

Installation work

10,000

9.

Uninterruptible power supply IR

15 766

10.

LEDs

3,000

Together:

197 739

6. * Contact details of the author of the project for public feedback.

Luneva Valeria (in case of interest in the project, the author's contact details will be provided personally to the investor).